Fiberglass Reinforced Heat Shrinkable Sleeve Extrusion Line For Oil Gas Pipeline Anti-Corrosion Protection
Product Overview
Developed by Qingdao Huashida Machinery Co., Ltd. with over 20 years of industrial manufacturing experience, this high-efficiency, energy-saving heat shrinkable tape and sleeve production line is an intelligent integrated system dedicated to producing premium pipeline anti-corrosion and joint sealing materials.
Adopting cutting-edge extrusion, irradiation crosslinking, and online lamination technology, the line can manufacture standard two-layer heat shrinkable products and upgraded three-layer fiberglass reinforced heat shrinkable tape/sleeve, widely applied for joint corrosion protection, repair, and sealing of various municipal, oil and gas pipelines, and industrial pipelines.
The whole line features low energy consumption, low noise, stepless speed regulation, and a high degree of automation, leading the domestic and international industry in technical performance and product quality.
Finished Products
- Standard Products: 650mm width, Two-layer PE heat shrinkable tape, sleeve-type heat shrinkable sleeves, clip-on heat shrinkable sleeves
- Upgraded Products: Three-layer fiberglass reinforced PE heat shrinkable tape/sleeve
Product Applications
Applicable Pipelines: Hollow wall spiral wound pipes, steel-reinforced spiral corrugated pipes, plastic-steel spiral wound pipes, double-flat-wall plastic-steel spiral wound pipes, PVC-U sewage pipes, polyurethane foam insulated pipes (black and yellow jacket pipes), 3PE/2PE steel pipes, seamless steel pipes, large diameter wastewater pipes, and other ordinary steel pipelines.
Main Application Fields: Municipal pipeline engineering, oil and gas long-distance transmission pipelines, industrial fluid pipelines, pre-insulated pipeline joint closure, pipeline damage repair, and girth weld straight joint field coating.
Application Examples
Heat shrinkable sleeve for Oil & Gas Pipe
Heat-shrinkable sleeve for Thermo Insulated Pipe
For metal reinforced HDPE corrugated pipe (drainpipe)
Complete Line Structure
- RS-800 PE Backing Extrusion Line: Output 150-200kg/h, responsible for high-purity LDPE substrate forming
- TJ-700 Adhesive Coating Line: Completes online adhesive coating, stretching, and shaping
- Fiberglass Reinforced Upgrade Configuration: Fiber unwinding, heating, and leveling equipment, 65/30 single-screw extruder, special T-shaped flat-head die
- Auxiliary & Control System: Irradiation crosslinking equipment, cooling system, haul-off unit, electric control system, ABB main motor
Operating Environmental Conditions
- Working Place: Indoor, no dangerous area
- Power Supply: 380V 50HZ (-10%, +5%)
- Humidity: ≤85%, no condensation
- Circulating Cooling Water: ~0.5m³/min (≤20ºC, 0.3Mpa)
- Compressed Air: ~0.4m³/min, >0.5Mpa
Main Equipment List
RS-800 PE Backing Extruder Line
| No. |
Equipment Name |
Quantity |
| 1 | Automatic Vacuum Feeder | 1 Set |
| 2 | Hopper Dryer | 1 Set |
| 3 | SJ-90*30 Single Screw Extruder | 1 Set |
| 4 | T-Die Mold | 1 Set |
| 5 | Hydraulic Filter Screen Changer | 1 Set |
| 6 | 3-Roller Calender | 1 Set |
| 7 | Roller Temperature Control System | 1 Set |
| 8 | Cooling Bracket with Lengthwise Cutting Device | 1 Set |
| 9 | Haul-Off Unit | 1 Set |
| 10 | Coiler | 1 Set |
| 11 | Electric Control System | 1 Set |
TJ-700 Adhesive Coating Production Line
| No. |
Equipment Name |
Quantity |
| 1 | Unpowered Uncoil Device (Separate Uncoiler Optional) | 2 Sets |
| 2 | PE Backing Stretching Unit | 1 Set |
| 3 | 300L Reactor | 1 Set |
| 4 | Adhesive Coating Roller | 1 Set |
| 5 | Cooling Water Tank | 1 Set |
| 6 | Haul-Off Unit | 1 Set |
| 7 | Digital Meter Counter | 1 Set |
| 8 | Coiler | 1 Set |
| 9 | Electric Control System | 1 Set |
Core Production Process
Standard Three-Step Forming Process
1. Substrate Extrusion: LDPE extrusion line produces high-purity PE backing film with uniform thickness
2. Irradiation Crosslinking: A professional electron accelerator irradiates the substrate to endow flame retardancy and high tensile strength
3. Online Lamination: Secondary stretching shaping, then real-time bonding with imported special hot melt adhesive, ensuring high peel strength and qualified shrinkage rate
Three-Layer Fiberglass Reinforced Process
Adds fiberglass unwinding, heating, and leveling steps to the standard process, realizes one-pass continuous forming of three-layer fiber-reinforced products, with higher strength and better shrinkage performance.
Our Advantages
- High Efficiency & Low Consumption: Innovative single-screw extruder with direct-connection technology, low energy consumption, high output, long service life, maximizes production profit
- Intelligent Control: PLC control system, ABB main motor, controllable production speed, fully automated operation, and reduces labor costs
- Stable Product Quality: Advanced T-shaped molds and coat hanger-style flow channels, high-precision mirror rollers, and patented secondary stretching equipment ensure uniform substrate thickness and low scrap rate
- Multifunctional Production: One set of equipment can produce various heat-shrinkable tape and sleeve products, avoiding redundant equipment investment
- Premium Configuration: Adopts top-brand electrical components, imported high-quality adhesive raw materials (DuPont, Sumitomo, Hanwha), stable performance, low failure rate
- Industry Leading Technology: Three-layer one-pass molding technology, reaching world-class level in equipment structure, vulcanization, and product performance
Core Test Parameters (Meet ASTM, DIN, GB/T International Standards)
- Adhesive Softening Point: 70-80°C (ASTM E 28)
- Shear Strength: ≥100N/cm (DIN 30 672)
- Tensile Strength: 15-20Mpa (ASTM D638)
- Elongation at Break: 350%
- Peel Strength: >150N/cm (ASTM D1000)
- Water-Intake Rate: 0.05% (ASTM D570)
Company Profile
Qingdao Huashida Machinery is a professional manufacturer of heat shrinkable tape production lines, pipe anti-corrosion equipment, and plastic machinery with over 20 years of industrial manufacturing experience. We have 9 senior engineers, a national high-end plastic machinery expert workstation, and 389 sets of successful global project application cases.
Our heat-shrinkable tape and sleeve production lines are exported to dozens of countries and regions worldwide, and we fully support customized production solutions to meet diverse customer requirements across output, product types, and pipeline applications.
Commercial Terms
Payment Terms
- 30% of the contract amount as a deposit within 2 working days after contract signing
- 67% of the contract amount before goods delivery
- 3% of the contract amount within 10 days after finishing installation and commissioning
After-Sales Service & Warranty
- Warranty Period: 12 months for mechanical parts, 6 months for electrical parts from the date of equipment receipt
- Free Services: Free technical documents, electrical drawings, and on-site operator training
- Installation & Commissioning: Professional technicians dispatched for on-site guidance; buyer covers round-trip tickets, accommodation, transportation, insurance, and USD 150 per person per day allowance
- Long-term Support: Lifetime technical consultation, spare parts supply, and after-sales troubleshooting
Delivery
Delivery Time
Production and delivery are completed within 90 days after receiving the deposit
Packaging & Shipping
Standard packaging with wrap film; wooden pallets or cartons are available at the buyer's cost
International Exhibition
Certifications
Общий рейтинг
Оценка
Ниже представлено распределение всех рейтингов:Все отзывы