logo

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating

1 комплект
MOQ
US$100,000.00-3,000,000.00 1 Set (MOQ)
цена
Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating
Характеристики Галерея Характер продукции Спросите цитату
Характеристики
Характеристики
Покрытие: Порошковое покрытие
Сертификация: CE, ISO
Dipe Dia.: 159-4200 мм
Модель полиэтиленового покрытия: Обертывание
Взрывные работы: >2,5 А
Выделить:

58-4200 mm Pipe Diameter 3LPE Coating Pipe Production Line

,

CE and ISO Certified Steel Pipe Anti-Corrosion Production Line

,

Powder Coating Three-Layer Polyethylene Pipe Production Line

Основная информация
Место происхождения: Циндао, Китай
Фирменное наименование: Huashida
Сертификация: EN253, EN448, EN728, ISO1133, ISO8501-1
Номер модели: 159-4200 мм
Оплата и доставка Условия
Упаковывая детали: СТАНДАРТНЫЙ ПАКЕТ
Время доставки: 70 дней
Условия оплаты: Л/К, Т/Т
Поставка способности: 50 ед./год
Характер продукции

Complete Internal and External Epoxy Coating Line for Steel Pipes 58-4200 mm  

Product Description

Qingdao Huashida Machinery Co., Ltd. specializes in the design and manufacturing of advanced equipment for steel pipe anti-corrosion systems. The Huashida 3LPE (Three-Layer Polyethylene) Coating Production Line is engineered to deliver reliable and high-efficiency corrosion protection for steel pipelines widely used in oil, gas, and water transmission projects.

The production line integrates complete processing systems, including steel pipe conveying, surface preparation, dust collection, pipe heating, electrostatic powder spraying, adhesive and polyethylene coating, water cooling, edge trimming, as well as hydraulic and pneumatic systems, inspection units, and intelligent electrical control systems. This ensures stable operation, precise coating performance, and consistent product quality.


Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 0
3PE can strengthen the pipeline's mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.
3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water and other fluids. They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.

Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 1

Main Equipment of 3PE anticorrosion processing
 

Main Equipment List

Configuration List

No. Name Set
A. Derusting Equipment                                          
1 Pipe-converying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 2
Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 3

Our Advantages

Why More Contractors Specify "Huashida 3LPE" When Choosing a Coating Line

1.One-pass acceptance: FBE + AD + PE applied simultaneously; 12 m pipe finished in 60 s, labor saved 30 %.
2.Lower freight cost: 1.2 m OD pipes ship directly without extra wrap, saving projects ~ US $150 k/year on packaging.
3. Easy maintenance: exchangeable extrusion die in 30 min; all motors & gearboxes are Chinese standard, bought locally.
Fast after-sales: factory 40 km to Qingdao port; common spares air-shipped within 72 h; English & Russian manuals and video training supplied.

The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system. 
Over 160 Huashida 3LPE lines are running in Turkey, Saudi, Mexico, etc.-the longest in service 10 years without major overhaul. 

Certifications

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 4

Packaging & Shipping

Packaged by wrapping film, the charge should be beard if used wooden pallet or wooden case demanded by buyer.

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 5


Exhibition

Complete 3LPE Coating Pipe Production Line for Steel Pipes 58-4200 mm with CE and ISO Certified Powder Coating 6

After Sales Service

-The guarantee period is 12 months for machinable parts, 6monthes for electrical parts.  After the end of the Guarantee period the Supplier is obliged to provide with lifelong service at the expense of Buyer.  
-During a warranty period of exploitation the Seller undertakes to execute warranty service of the equipment, troubleshooting and replacement of out of service spares, except for breakings, bound with incorrect exploitation of the equipment by the Buyer.
-Seller provide the technical service with free, and training the workers of buyers.

FAQ

Q1. What is the range of pipe diameter the equipment can produce?
A: Diameter of steel Pipe: 48-219mm,219-1220mm,800-1600mm,1000-2400mm
Q2. What is the sand blasting grade?
A:SA2.5
Q3. What is your anti-corrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time?
A: 2-3monthes after deposit.
Q5. Production output 
A: It is different output capability as different pipe diameter, the Max. is 3 to 8 km/day, and annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness: 
A: 80~800um
Q7. To which country did you sell your 3PE equipment?
A. We have produced nearly 50 sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q8. After-sales service: 
A:  Warranty period:
Before delivery all the equipment must be trial operated  to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for mechanical part , and 6 months  for the electrical part.
Service:
We provide technical services and provide training and guidance to buyer operators.

Порекомендованные продукты
Свяжись с нами
Контактное лицо : Mr. Lily
Телефон : +8615969839906
Факс : 86-532-80999083
Осталось символов(20/3000)